{"acquisitions":[],"changes":[],"country":"US","description":"Last Energy designs modular 20 MW nuclear power plants built in a factory and installed at industrial sites, targeting data centers and heavy industry seeking firm, low-carbon power. Its standardised PWR-20 is pre-licensed as a plant design rather than a site-specific approval, compressing permitting timelines.","domain":"last-energy.com","employees":null,"founded":2019,"fundingTotalQuarantined":false,"githubOrg":null,"githubStars":null,"industry":"unknown","industrySources":[],"investors":[],"lat":38.895098,"lng":-77.036385,"location":"Washington, US","multiples":[],"name":"Last Energy","people":[],"revenues":[],"rounds":[{"amountQuarantined":false,"amountUsd":100000000,"connectionsAmong":[],"currency":"USD","date":"2025-12-16","investments":[],"investors":[],"leadInvestor":null,"leadInvestors":[],"people":[],"slug":"last-energy-com-2025-12-16-series-c","source":{"fact":"round","publisher":"techcrunch","retrievedAt":"2026-05-05","status":"attributed","url":null},"status":"attributed","type":"series-c","url":null}],"slug":"last-energy-com","sources":[{"fact":"round","publisher":"techcrunch","retrievedAt":"2026-05-05","status":"attributed","url":null},{"fact":"existence","publisher":"last-energy.com","retrievedAt":"2026-05-05","status":"self-reported","url":"https://last-energy.com"},{"fact":"description","publisher":"last-energy.com","retrievedAt":"2026-05-05","status":"self-reported","url":"https://last-energy.com"}],"stage":"series-b+","stockCard":{"asOf":"2026-11-09","facts":[],"generatedAt":"2026-11-09","state":"insufficient-evidence","tldr":[]},"techStack":["Typekit","Adobe Fonts","Afterpay","Sentry","Squarespace","Squarespace Commerce","Stimulus","web-vitals","moment 0","spring-framework","@sentry/browser"],"totalRaisedUsd":100000000,"traction":[],"updatedAt":"2026-05-05","valuations":[]}