{"changes":[],"country":"NL","description":"Ore Energy is commercialising iron-air long-duration battery storage with up to 100 hours of discharge using iron, air, and water. The first grid-connected pilot is online at The Green Village in Delft and a second 100-hour pilot is running at EDF labs in France. The company spun out of TU Delft in 2023 and is the first iron-air system entirely built within the EU.","domain":"ore.energy","employees":null,"founded":2023,"fundingTotalQuarantined":false,"githubOrg":null,"githubStars":null,"industry":"climate","investors":[],"lat":51.999457,"lng":4.362724,"location":"Delft, Netherlands","name":"Ore Energy","rounds":[{"amountQuarantined":false,"amountUsd":2700000,"currency":"EUR","date":"2024-09-01","investors":[],"leadInvestor":null,"source":{"fact":"round","publisher":"eu-grant","retrievedAt":"2026-05-11","status":"attributed","url":null},"status":"attributed","type":"grant","url":null}],"slug":"ore-energy","sources":[{"fact":"round","publisher":"eu-grant","retrievedAt":"2026-05-11","status":"attributed","url":null},{"fact":"existence","publisher":"ore.energy","retrievedAt":"2026-05-11","status":"self-reported","url":"https://ore.energy"},{"fact":"description","publisher":"ore.energy","retrievedAt":"2026-05-11","status":"self-reported","url":"https://ore.energy"}],"stage":null,"techStack":[],"totalRaisedUsd":2700000,"updatedAt":"2026-05-11"}